Update | Pexels by Anna Tarazevich
Update | Pexels by Anna Tarazevich
TXDOT contractors have scheduled the following closure for the Highway 69 construction project:
Lane Closed: Southbound Middle Lane TOTAL CLOSURE (FM 365 to SH 73) Highway: US 69 Southbound Middle Lane
Time: 8:00 PM (Saturday 02-25-23) to 3:00 AM (Sunday 02-26-23)
Reason: Removal of existing Overhead Sign Bridge
Motorists will use the attached Detour 10. This Detour will also have some modifications to address the Jimmy Johnson intersection.
Original source can be found here.